Yering to the River – 1B.2 Construction Update
Yering to the River – 1B.2 Construction Update Construction continues along Stage 1B.2 between Yering and the Birrarung | Yarra River, towards Yarra Glen. This stretch includes four bridges running along the elevated rail corridor. This section of the trail is [...]









