Yarra Valley Trail features a well-formed, unsealed surface, stabilised with a 3% mix of cement where necessary.
This surface type has been selected based upon a range of factors, including commonality with the Lilydale to Warburton Rail Trail, maintaining a rural / natural character, construction cost, and its ability to cater to a wide range of trail users.