Skip to content
Quick facts and figures
- Network length: 177km
- Number of trails: 61
- Jobs created (by 2031): 229
- Annual visitors (by 2031): 128,000, participating in 222,000 rides.
- Regional spend (by 2031): $48 million
- Overnight visitors (by 2031): 77,000
- 4 trail heads: Warburton Golf Club, Mt Donna Buang, Mount Tugwell, Wesburn Park
- 2 major bridges
- 22 small bridges to protect waterways
- 47 sections of boardwalk
- Typical trail width: 600mm-900mm
- 66 % cross country; 34 % gravity trails
- Proposed new MTB trails: 164.7km (88%)
- Existing MTB trails to be merged into network: 14.9km (8%)
- Existing vehicle track merged into network: 7km (4%)
- 63% trails on valley south side; 37% on valley’s north.